5 June 2021
romanyaya gerçekleştirelin kazan imalatı görseli

Destination Romania!

Destination Romania! Our 27 t/h 16 barg capacity fire tube type steam boiler, 4.5 t/h 16 barg capacity waste heat recovery steam boiler and all their auxiliary equipment are loaded and embarking their journey to Romania to operate in starch industry.
27 May 2021

ASME certifications are extended

As Selnikel Energy Heat Air Technics, we are delighted to announce that our ASME Joint Review for S&U stamp has been completed successfully without any deficiency and our ASME certifications are extended. Congratulations to everyone who supported us during the preparation stage and audit.
27 May 2021
Alev - Duman Borulu atık ısı kazanı ihracatı

Fire tube type waste heat recovery boiler system and its auxiliary equipment installation have been successfully commissioned

Our 15 t/h 14 barg capacity fire tube type waste heat recovery boiler system and its auxiliary equipment installed behind Solar T70 gas turbine have been successfully commissioned at the paper factory located in Romania. Congratulations to everyone who was a part of this project.
27 May 2021
Buhar kazanı ihracatı

Fire tube Boiler delivery

Our 16 t/h 10 barg fire tube type steam boiler, 12 MW burner and their auxiliary equipment are on their way to Istanbul to operate in textile industry.
27 May 2021
20 t/h 15 barg kapasiteli alev duman borulu buhar kazanımız, 15 MW brülörümüz ile kazan dairesi yardımcı ekipmanlarının yüklemesi tamamlandı ve nişasta endüstrisinde kullanılmak üzere Kazakistan'a olan yolculuğuna başladı.

Destination Kazakhstan!

Destination Kazakhstan! Our 20 t/h 15 barg capacity fire tube type steam boiler, 15 MW burner and their complete boiler house auxiliary equipment are loaded and embarking their journey to Kazakhstan to operate in starch industry.
23 May 2020

Fire Tube Type Steam Boiler System, Burner and Their Auxiliary Equipments are Waiting to be Transported to Çanakkale

Our 10 t/h 11 barg capacity fire tube type steam boiler system, burner and their auxiliary equipments are waiting to be transported to Canakkale to operate in food industry.
6 May 2020

Our 15 t/h 14 Barg Capacity Fire Tube Type Waste Heat Recovery Boiler System and Its Auxiliary Equipments Are Loaded

Our 15 t/h 14 barg capacity fire tube type waste heat recovery boiler system and its auxiliary equipments are loaded and embarking their journey to Romania to operate in paper industry.
9 February 2020

We Minimise Manuel Welding Defects in a Mechanised Manner

With our submerged arc welding machine, we minimise manuel welding defects in a mechanised manner, which corresponds over 30% improvements in labour and process completion durations.
4 February 2020

Jet-Pulse Cyclonic Filter has Been Successfully Installed

Our 35.000 m3/h, 1.200 mmWG Jet-Pulse Cyclonic Filter has been successfully installed at the MDF plant in Sakarya.