Our 28 t/h 11.5 barg capacity fire tube type waste heat recovery boiler system and its auxiliary equipments are ready to be transported to Corlu to operate in one of the leading paper factories of the world. For our waste heat boiler projects, we install all the equipments and duct connections from by-pass chimney to the main chimney at our factory, thus creating a “site scenario” to ensure a seamless integration at site and minimise installation downtimes.