Selnikel offers highly efficient solutions in
energy, heat and air technologies

SELNIKEL; with its renewed dynamic structure and production facility possessing 24.000m2 closed area in Ankara, Turkey.
Selnikel is one of the leading industrial brands of Turkey that manages to run 3 stages
successfully – design, manufacturing and erection/commissioning altogether since 1955.

Watch our introduction film

we produce industrial boilers, industrial fans and we carry out the production of industrial burners for the most prestigious projects in Turkey and many other countries

About Selnikel

anasayfa_hakkında

Selnikel Inc. is a manufacturer company operating in the fields of energy, heat and air technology. It manufactures power plants, industrial boilers, industrial fans and industrial burners in the most prestigious projects in Turkey and many countries.Quality, continuous improvement, training on the job and reaching the highest standards in expertise and putting this expertise in use are Selnikel's indispensable principals from past to present.

With this identity, Selnikel has managed to win the trust of leading German manufacturers. These manufacturers, whom are the experts as well as the pioneers in their fields, have chosen Selnikel as a partner and have considered her as a peer after extensive investigations.

Read More

Clients

Selnikel With Numbers

200+

Personnel


10000+

Projects


70+

Years of Experience


67+

Countries


Latest Updates From Selnikel

6 May 2020

Our 15 t/h 14 Barg Capacity Fire Tube Type Waste Heat Recovery Boiler System and Its Auxiliary Equipments Are Loaded

Our 15 t/h 14 barg capacity fire tube type waste heat recovery boiler system and its auxiliary equipments are loaded and embarking their journey to Romania to operate in paper industry.
28 February 2020

Successful WHB installation and commissioning in Romania

We love cogeneration! Our 15 t/h 14 barg capacity fire tube type waste heat recovery boiler system and its auxiliary equipments are ready for transport to Romania. For our waste heat boiler projects, we install all the equipments and duct connections from by-pass chimney to the main chimney at our factory, thus creating a “site scenario” to ensure a seamless integration at site and minimise installation downtimes.
9 February 2020

We Minimise Manuel Welding Defects in a Mechanised Manner

With our submerged arc welding machine, we minimise manuel welding defects in a mechanised manner, which corresponds over 30% improvements in labour and process completion durations.

Contact Us