27 May 2021
Buhar kazanı ihracatı

Fire tube Boiler delivery

Our 16 t/h 10 barg fire tube type steam boiler, 12 MW burner and their auxiliary equipment are on their way to Istanbul to operate in textile industry.
27 May 2021
Alev - Duman Borulu atık ısı kazanı ihracatı

Fire tube type waste heat recovery boiler system and its auxiliary equipment installation have been successfully commissioned

Our 15 t/h 14 barg capacity fire tube type waste heat recovery boiler system and its auxiliary equipment installed behind Solar T70 gas turbine have been successfully commissioned at the paper factory located in Romania. Congratulations to everyone who was a part of this project.
27 May 2021

ASME certifications are extended

As Selnikel Energy Heat Air Technics, we are delighted to announce that our ASME Joint Review for S&U stamp has been completed successfully without any deficiency and our ASME certifications are extended. Congratulations to everyone who supported us during the preparation stage and audit.
5 June 2021
romanyaya gerçekleştirelin kazan imalatı görseli

Destination Romania!

Destination Romania! Our 27 t/h 16 barg capacity fire tube type steam boiler, 4.5 t/h 16 barg capacity waste heat recovery steam boiler and all their auxiliary equipment are loaded and embarking their journey to Romania to operate in starch industry.
1 July 2021

Looking handsome!

Looking handsome! Our 2 x 750 kW, 9 barg capacity waste heat recovery hot water boilers and auxiliary equipments are completed and ready to be transported to Alanya to operate in an integrated industrial waste treatment plant.
1 July 2021

Shipping to Çankırı

20 t/h 20 barg kapasiteli su borulu buhar kazanımız, brülörümüz ve yardımcı ekipmanlarının imalatı tamamlandı. Çankırı'ya sevkedilecek kazanlarımız lastik imalat sektöründe faaliyet gösterecek.
1 July 2021

Safe Operation, Durable Systems and Engineering Excellence in Steam Boiler Applications” technical training

Throwback to our "Safe Operation, Durable Systems and Engineering Excellence in Steam Boiler Applications" technical training conducted in Tashkent, Uzbekistan before the pandemic. A huge thank you for everyone who has greeted us with a great interest. We are looking forward to meeting you again.
1 July 2021

Industrial fan transportation to Saudi Arabia

Our 4 x 250 kW 128.000 m3/h and 8 x 22 kW 17.700 m3/h capacity fans which were manufactured for poultry processing industry will soon be transported to operate in Saudi Arabia.
1 July 2021

Selnikel was ranked amongst the top 200 HVAC exporters of Turkey in 2019

We are extremely proud to announce that Selnikel was ranked amongst the top 200 HVAC exporters of Turkey in 2019. We are fully aware of the importance of exports for the Turkish economy and shall be committed to sustain our success abroad. Congratulations to our whole team for this achievement.