Buhar kazanı ihracatı
Fire tube Boiler delivery
27 May 2021
ASME certifications are extended
27 May 2021

Fire tube type waste heat recovery boiler system and its auxiliary equipment installation have been successfully commissioned

Alev - Duman Borulu atık ısı kazanı ihracatı

Our 15 t/h 14 barg capacity fire tube type waste heat recovery boiler system and its auxiliary equipment installed behind Solar T70 gas turbine have been successfully commissioned at the paper factory located in Romania. Congratulations to everyone who was a part of this project.